find-partner-btn-inner

Enhancing EV Charging Reliability: A Summary of the UK's 2023 Public Charge Point Regulations

The electric vehicle (EV) revolution continues to gain momentum, and in the UK, the government has set ambitious targets for EV adoption (albeit such targets have become less ambitious in the last few months).

The growth and pace of EV adoption in the UK have also highlighted the need for robust and reliable public charging infrastructure.

The UK is currently widely recognised to be lagging behind in the installation of EV charging infrastructure, with most analysts calling for a significant ramp-up in installations of public EV charge points to support the UK’s growing electric fleet.

While it is clear that the UK government will need to do more to stimulate installation of public charging infrastructure, it is also responding to these challenges through the Public Charge Point Regulations 2023, which are aimed at enhancing the reliability of existing public EV charge points and providing drivers with a more standardised charging experience.

Key Provisions for Enhanced Reliability

A cornerstone of the regulations is the 99% reliability requirement, mandating that networks of public rapid charge points must be available for use 99% of the time. This ambitious target addresses a significant pain point for EV drivers, who sometimes encounter out-of-service or malfunctioning charge points, disrupting their journeys and leading to a less certain overall driving experience.

To ensure compliance, it will be necessary for charge point operators to monitor their networks and implement proactive measures to prevent downtime. Real-time data sharing and remote diagnostics will be crucial in identifying and rectifying issues promptly so that reliability requirements can be met. An additional regulatory and reporting compliance burden will also be created by operators needing to monitor and report on the applicable performance metrics.

Moving Forward: Ensuring a Smooth Transition

The UK government has implemented a phased-in approach to the regulations, allowing a period of one year for charge point operators to adapt their infrastructure and meet the new standards. This gradual approach aims to minimize disruptions and ensure a smooth transition.

While challenges remain, particularly for smaller operators, the phased-in approach and ongoing monitoring mechanisms will ensure a smoother transition.

Assessing the Impact

The regulations have so far attracted mixed reactions. On the positive side, the 99% reliability requirement is certainly pro-motorist and evidences a firm commitment to a dependable EV charging network across the UK.

Additionally, the regulations introduce a requirement for the offer of contactless payment options and price transparency, which should help to simplify the charging process.

Concerns have been raised regarding the potential impact on smaller charge point operators. The stringent reliability standards will undoubtedly lead to an increase in overall cost and regulatory burden.

On balance, we see these regulations as helpful. The public EV charging market has matured very rapidly over the last three years, with significant improvements in the overall user experience already achieved.

However, this market must necessarily still go through a period of intense growth if it is to support the UK’s EV fleet over the next 10 years. The 99% reliability requirement, coupled with contactless payment options and 24/7 support, has the potential to make the overall EV charging experience significantly more predictable and reliable, supporting the continuing adoption of EVs in the UK.

Featured Insights

How can we partner with you?

Fladgate has always been structured around deep relationships, creating true partnerships with clients.

get in touch
Photo