On 5 November 2026, the First-tier Tribunal (FTT) handed down their decision in Housing Secretary -v- Urban Splash Ltd and others [2026] UKFTT 01426 (PC), providing insight into factors considered by the FTT when determining whether it is just and equitable to make a Remediation Contribution Order (RCO). 

In one of the most significant decisions concerning RCOs to date, the FTT ordered Urban Splash and four associated entities to pay over £46 million towards the cost of remediating seven high-rise residential buildings.

The decision is key for three reasons: 

  1. 10% reduction to reflect the Government’s own share in the building-safety crisis; 
  2. “practical control” reading of the association test in section 121(8) of the Building Safety Act 2022 (BSA); and 
  3. detailed account of when it is just and equitable to make an order against an associate that never touched the buildings.

Background

In March 2024, the Secretary of State applied for seven RCOs under section 124 of the Building Safety Act 2022, in one of the Government’s first attempts to recover Building Safety Fund (BSF) expenditure of c.£52 million. 

Urban Splash assisted investigations following the Grenfell Tower tragedy, but did not carry out or pay for the remedial works. Works were undertaken at each building in relation to extensive fire-safety defects identified, with the principal defects involving combinations of combustible materials, ineffective cavity barriers and fire-stopping, and compartmentation failures. The works were funded by the BSF at a cost of over £51 million, with £741,594 incurred by the management company of one of the buildings. 

RCO Outcomes

The Tribunal found that each of the seven buildings contained relevant defects, and that the remediation schemes undertaken represented reasonable responses to them. That is hardly surprising given the low / non-existent threshold following Vista and Canary Riverside. 

Consistent with decisions such as Triathlon, the FTT confirmed the original developer stands at the top of the hierarchy for who should pay remediation costs. Relevant factors in deciding whether or not an associated entity was liable include the nature and strength of its connections with the developer and the relevant buildings in question. 

RCOs were made requiring R1, R2, R3, R4 and R11 to pay a total of £46,500,650 on a joint and several basis. R1 was the original developer, Urban Splash Limited. R2 (Urban Splash Developments Limited) had become the “principal vehicle” through which Urban Splash conducted its property development arm following a restructuring. R3 (Urban Splash Group Holdings Limited) is the ultimate parent company, and R4 (Urban Splash Work Limited) forms part of the same wider property-centred enterprise, operating under common ownership and control. 

Although R11 (Stubbs Mill LLP) was established after the buildings had been completed and had no involvement in their construction, its members are five individuals who comprise the senior leadership of Urban Splash, with substantial connections to the wider enterprise. 

In respect of the remaining Respondents, against whom no RCO was made: 

  • R5 (TBI 2000 Limited) and R6 (TM Freeholds Limited) were private family investment companies, whose activities and assets are distinct from the Urban Splash property enterprise, and neither were considered to have any “meaningful connection” with the buildings at issue or their development. The FTT decided the fact that an associated entity holds assets from which an order might be satisfied cannot itself justify imposing liability upon it. 
  • R8 (Shed KM Holding Limited) and R9 (Shed KM Limited) reached a settlement with the Secretary of State before the final hearing. 
  • R7 (SURE Residential A Limited) forms part of a residential investment fund, being one of three feeder vehicles to the master fund (R10). R10 (SURE Residential LLP) forms part of the same fund as R7 but is an LLP (meaning the provisions which determine whether an LLP is associated with a company are different to those where both entities are companies) whose early investment opportunities were supplied by R1. The Tribunal agreed that R1 and R10 were not associated, finding that “influence was not control”, and the fund retained genuinely independent processes. For this reason, an RCO was not made against R10. 

Lessons

Reduction for Government Responsibility 

The Tribunal were satisfied that a reduction in the remediation costs payable by Urban Splash was just and equitable, to take into account the Government’s accepted contribution to the circumstances which produced the building safety crisis. A 10% reduction was applied to the BSF-funded costs to reflect the Government’s own systematic failures identified in the Hackitt Review and the Grenfell Inquiry. 

Had the buildings complied with the standards in force when they were built, the Tribunal would have given the argument materially greater weight, with a reduction of approximately 20% banded as the upper limit. That ceiling was benchmarked against the standard rate of VAT: a developer that funds remediation itself can recover or offset VAT, and a larger reduction would leave a developer who waited better off than one who paid voluntarily. Because aspects of the original construction did not comply even with contemporaneous standards, the Tribunal settled on 10%. It stressed that this is an exercise of evaluative judgment, not an apportionment of causative responsibility. The reduction applies only to BSF-funded expenditure, not to the £741,594 incurred by the management company.

Alternative Solutions 

The FTT granted approximately £420,000 (with the true cost alleged by the Respondents to be much higher) for the replacement of the aluminium lettering at one of the buildings, despite being for principally aesthetic purposes and not a relevant defect. The FTT recognised that viewed in isolation, such expenditure was capable of appearing unusual and attracting scrutiny but ultimately, it was the for the Respondents to advance alternative solutions. 

The FTT considers its role is not to “devise hypothetical remedial schemes and then assume that they would have performed equally well, complied with all relevant constraints and cost less money.” The evidential burden is on the party proposing the alternative solutions; in the absence of a viable alternative, the FTT will not be satisfied that expenditure is unreasonable. 

BSR Delays 

In keeping with the evidential requirement, the Tribunal also declined to reduce the remediation costs otherwise shown to have been reasonably incurred due to delays in the BSR approval process. This was said to be because no coherent evidential basis was advanced upon which the Tribunal could identify the costs attributable to any particular delay, determine whether that delay was unreasonable, or quantify any resulting deduction. The same, as it happens, concerned loss and expense because where remedial costs include such entitlement, the fact the claim has gone through various rounds of approvals with cost consultants and the BSF itself means one has to take the sum at face value. 

Conclusion 

Urban Splash confirms the developer remains at the top of the hierarchy. No surprises there. For developers and freeholders, the 10% reduction offers limited comfort: a discount for Government failings is available, but it will be modest where buildings were non-compliant when built and capped in any event at around 20%. It will be interesting to see if a higher cap can be applied where, say, the local authority certified compliance with building regulations at the time and the respondent is, say, the current freeholder who had nothing to do with the original development. 

For associates under section 121, the decision sets clear limits as well as risks. The continuation of the development enterprise, a parent’s position at the apex of the group, and participation in the same property-centred business will justify an order even without any avoidance purpose. Association does not directly equate to liability, and family investment vehicles and third-party fund investors are not fair game merely because the alternative is the public purse. After all, section 121 may catch an associate as a named respondent, but that does not necessarily mean it will be just and equitable for an order to be made against it. 

For future RCO applications, the lesson is above all evidential. Respondents who challenge the scope or cost of remediation must adduce admissible, developed evidence of a workable alternative. 

Share

Authored by

Related Team

Noah
Wortman

Head of Strategy, Walgate Litigation Management, a division of Fladgate LLP
Meet Noah

Sarah
Haile

Head of Walgate Family Office Services
Meet Sarah

Steven
Mash

Director of Business Strategy - Walgate Litigation Management, a division of Fladgate LLP
Meet Steven